The Blake Building, Southampton: brick and timber-clad residential block with balconies above a landscaped courtyard
THE BLAKE BUILDING · ACROSS THIS PROJECT
VALUE
£8.1m
STAGE
Gateway 2 approved, on site
OUR ROLE
PCSA, supporting Thomasons
NATION
England
OCCUPIED
Yes
PROJECTS / SOUTHERN REGION / THE BLAKE BUILDING

The Blake Building

A nine-storey occupied residential building in Southampton, classified as a High-Risk Building and engaged early under a Pre-Construction Services Agreement so the remediation strategy could be worked through before anyone was on site.

KEY FACTS
Contract value
£8.1m
Client
Brigante Properties, with Thomasons
Our role
PCSA, supporting Thomasons
Contract
JCT Design and Build 2024
Regulatory stage
BSR Gateway 2 approved
Nation
England
Occupied
Yes, throughout
Duration
60 weeks
Location
Ocean Village, Southampton
PROJECT FILM · ON SITE

Drone footage from site, August and September 2026.

What the job involved

Built in 2012 and clad in a mixture of brick cavity, rendered EPS, rendered block and curtain walling. As a High-Risk Building, remediation follows the Building Safety Regulator’s Gateway process and the Golden Thread. The job is to replace the combustible façade elements with a fully compliant design that meets the statutory, fire safety and technical requirements needed for Gateway 2 approval.

IRS was engaged under a Pre-Construction Services Agreement. We supported Thomasons in their role as Building Regulations Principal Designer, so the Gateway 2 application was complete and backed by an accurate Golden Thread of building information. Once it was submitted we engaged with the Building Safety Regulator alongside Thomasons, addressing queries early and providing clear, robust evidence. Gateway 2 is now approved and the works are on site.

Intrusive surveys during pre-construction established what the existing structure actually was and where the hidden constraints sat. Resolving design, access and sequencing at that stage de-risked the programme, cut redesign during construction and gave certainty on cost, programme and quality before anyone was on site.

EARLY INVOLVEMENT

IRS was brought in early under a Pre-Construction Services Agreement to work through design, access and sequencing with Thomasons, so cost, programme and delivery risk were tested before anyone was on site.

How we work through PCSA →
RESIDENT LIAISON

People live here throughout. Access, sequencing and working hours are planned around residents, and the early survey work is used to keep later disruption down rather than discovering problems once the scaffold is up.

The programme

STAGE 01
Early PCSA engagement

IRS engaged under a Pre-Construction Services Agreement to meet the client brief and evidence full compliance with BSR requirements.

STAGE 02
Intrusive surveys

Completed to understand the existing building structure and identify hidden constraints before construction began.

STAGE 03
Gateway 2 submission

Supporting Thomasons as Building Regulations Principal Designer, with a complete and accurate Golden Thread of building information.

STAGE 04
Gateway 2 approved

Queries addressed early and clear evidence provided. Approval granted, and the works are now on site.