OLD SHERIFF COURT - ACROSS THIS PROJECT
VALUE
£ 4.3m
STOREYS
Courtyard
CONTRACT
JCT Design & Build
REGION
Scotland
COMPLETION
July 2027
PROJECTS / [SCOTLAND / OLD SHERIFF COURT

Old Sheriff Court

Old Sheriff Court is a listed former courthouse in Glasgow’s Merchant City, redeveloped
by Persimmon Homes in the early 2000s into residential, retail, leisure and youth arts theatre use. Delivered under a Persimmon Developer Remediation Contract as part of Scotland’s Cladding Remediation Programme, the project replaces combustible façade elements with
compliant, non-combustible materials.

KEY FACTS
Agent
Thomasons
Client
Persimmon Plc
Value
£4.3m
Contract
JCT Standard Building Contract 2016 without Quantities
Location
Merchant City, Glasgow
Region
Scotland
Start on Site
August 2026

What the job involves

The existing render system does not comply with current regulations. We will safely remove it to allow structural engineers to inspect the SFS structural metal framing. If required, we will remediate the substrate to ensure it complies with regulations, then install a new compliant render system. Consultants will also inspect the windows for compliance. The top levels have a ‘K Wall’ system installed, which is non-compliant with current regulations. The team will remove in a safe, controlled manner while the building remains occupied. Existing windows will be replaced with Martec-designed windows to ensure compliance and allow sufficient light into the properties. Sika Systems have been installed in various areas. The roofing system at roof level will be fully inspected and remediated where required by specialist installation teams. External gantry walkways will be fully remediated.

DEDICATED RESIDENT LIAISON OFFICER

Noel Boyle is the dedicated RLO on the project, keeping residents and businesses informed about progress and access throughout.

The programme

PHASE 1
Site set up

Site set-up, scaffolding and pre-conditions surveys

PHASE 2
Removal

Safe removal of non compliant render to inspect SFS structure

PHASE 3
Replacement

Replace existing windows with Martec designed compliant windows

PHASE 4
Roofing System

Full inspection and remediation where required to roofing and external gantry walkways